Solution
Kereen Building Services designed and installed a bespoke multi-plant solution centred on Mitsubishi Electric's Ecodan Air Source Heat Pump technology.
For the main residence, the team specified two 14kW Mitsubishi Electric Ecodan split heat pumps, each paired with a dedicated 300-litre domestic hot water cylinder. These supply low-temperature underfloor heating throughout the property, enabling comfortable and even heat distribution while complementing the efficient operating characteristics of the heat pumps.
Rather than extending the domestic system to accommodate the substantial additional requirements of the leisure facilities, Kereen Building Services designed a separate plant strategy specifically for the swimming pool environment.
An 8kW Mitsubishi Electric heat pump, paired with a 200-litre cylinder, provides underfloor heating within the swimming pool building. A dedicated 14kW Mitsubishi Electric Hydrobox system is responsible for maintaining the swimming pool water temperature.
This approach allows the residence and leisure facilities to operate independently, giving the homeowner greater flexibility while ensuring each heat pump can respond to its own application and demand.
Careful engineering underpinned the entire installation. Kereen Building Services developed the hydraulic design, pipework layout and distribution around the characteristics of the individual systems, while the dual plant room configuration provides clear separation between domestic and leisure services and improves accessibility for maintenance and future servicing.
The intelligent building control platform brings the systems together, enabling advanced zoning, scheduling and temperature management across the property. This allows four independent Mitsubishi Electric heat pump systems to work as part of one coordinated energy strategy.
The installation was further complemented by 50 Solar PV panels, providing renewable electricity generation that can help offset electrical demand from the property's heating systems.
Kereen Building Services also carried out detailed commissioning of the complete installation, verifying flow rates, temperatures, control logic and system sequencing. The underfloor heating circuits were carefully commissioned and balanced to promote consistent heat distribution and support efficient low-temperature operation.